Commercial HVAC engineering

Building Management System Integration

Centralised HVAC control can coordinate zones, schedules and equipment status in hotels, commercial premises and residential complexes. We start with a technical brief and a compatibility review.

Start with system architecture

Before selecting controls, we confirm indoor and outdoor unit types, communication interfaces and building-automation objectives. Integration depends on the specific brand and controller.

  • Review the existing VRF/VRV, multi-split or other HVAC equipment.
  • Agree control zones, user permissions and required signals.

Functions and scope

Available scenarios depend on the equipment and project: central status, schedules, mode limits or signal exchange with the BMS. We verify technical interfaces before confirming functionality.

  • Integrate through a compatible central controller or gateway.
  • Commission and test the agreed operating scenarios.

Project-based quotation

Price and timing depend on the number of units, communications architecture, cabling and configuration. For an assessment, share drawings, equipment models and the functions required.

  • Projects served in Nessebar, Burgas and Bulgaria's southern coast.
  • Complex systems may require a site visit, coordination and staged commissioning.

Commercial HVAC engineering

Frequently asked questions

Can every air conditioner connect to a BMS?

Not always. Compatibility depends on the series, controller and available interface. We review the documentation before confirming a solution.

What is needed for an initial assessment?

Share drawings, equipment models, the number of zones and the controls required. This helps establish a realistic scope.

Hero Image

PLAN THE AIR CONDITIONING RIGHT FROM THE START.

A better project. A cleaner installation. Fewer unforeseen costs during construction.

Contact us