Installation for your site conditions

Additional air conditioner installation work

Not every installation fits a standard package. Longer pipe routes, restricted access or extra materials may require a separately agreed scope before work begins.

Work that may need a separate assessment

Wall construction, distance between units and outdoor unit position affect the time, materials and installation arrangements.

  • Extended or pre-laid refrigerant pipework.
  • Additional condensate drainage or specialist brackets.
  • Drilling through dense walls and restricted or elevated access.

Confirming the scope before work

We review the installation area and agree on the necessary materials and tasks. Additional work is included in the quote so the scope is clear before installation.

  • Share photos of the route and unit positions where possible.
  • Work at height or difficult access may require a preliminary site survey.

Installation for your site conditions

Frequently asked questions

Are additional materials included in standard installation?

Not always. The exact scope depends on the selected package and property; we confirm materials and cost in advance.

Can pipework be prepared before renovation?

Yes, pre-installation can be planned before finishing work. Required connections and dimensions are confirmed for the selected unit and positions.

Hero Image

PLAN THE AIR CONDITIONING RIGHT FROM THE START.

A better project. A cleaner installation. Fewer unforeseen costs during construction.

Contact us